For operations
Know which losses to fix first.
For plant and production managers who need one ranked answer instead of five reports that disagree, and a clear picture of what every stop and every utility loss costs the plant.
One ranked answer
The plant’s losses, in priority order.
Production, equipment and utility losses share one list, ranked by what each is worth a year. The morning meeting starts with the first row instead of a debate over whose numbers are right.

Your day in Crucion
From the morning briefing to the end of the shift.
A site briefing, written for you
What happened overnight, which findings are critical, and the biggest losses on the table, summarized in plain language each morning.
Peak demand, before it happens
Crucion projects the demand interval underway against your contracted limit, so the team can act before a new peak sets this month’s charge.
Downtime and yield by work center
Mechanical, operator and material stops above your declared normal, throughput loss and first-pass yield, judged at each work center.
The whole event, not a piece
Which machine started it, which ones it blocked or starved, how long the line was down and what it cost to make up.
Alerts that reach the team
A device that stops reporting or a reading that flatlines is flagged and sent to your team in Microsoft Teams.
Decided, and followed through
Act, discuss, investigate, watch, acknowledge, dismiss or resolve. Nothing sits in a report waiting for someone to notice it.

Every stop
Every stop on every line, with its cost.
Crucion records each stop as it happens and keeps the full list, so a bad shift is a set of facts, not a memory.
Utilities and production together
Utilities judged against what the line was doing.
Energy and water only make sense next to production. Crucion knows when each line is running, idle or down, and judges utility use against it.
Flow while the line is idle
Rinse water still running while the line is idle is flagged against the line’s declared idle flow, and priced.
Supply that keeps lines running
Crucion knows which compressor feeds each line and the pressure each machine needs, so a supply problem is traced to the stop it caused.
Peak demand during the shift
The demand interval underway is projected against your contracted limit, in time for the team to act.
What runs when nothing should
A step up in overnight load is caught and priced, while load that runs every night is treated as baseline, not as savings.
Efficiency at the same conditions
Chillers, glycol and cooling towers are compared at the same weather and load, so a hot week isn’t mistaken for a problem.
Boiler efficiency on the same hours
Fuel used per unit of steam, compared on the same firing hours, so drift shows up before the fuel bill does.

Ask CrucionAI
Answers before the morning meeting.
Ask about any stop or finding in plain language. CrucionAI answers from your plant’s own records and links to the evidence.
Your plant, your rules
Priced the way your plant runs.
Operations sets the terms Crucion judges against. Change one, and every figure that depends on it follows.
The downtime each line is expected to have per shift. Only time above it is a finding.
Choose whether lost minutes are made up at a cost or lost as margin, line by line.
Your shift windows and production days, so losses are annualized on your schedule.
How much of a loss your team can realistically recover, so targets stay honest.
